Reducing Non-Productive Time (NPT) with Expert Fluid Management
Non-productive time (NPT) is a major cost driver in drilling operations, often caused by fluid-related issues such as wellbore instability, formation damage, or equipment failure. Fluidsteq Services minimizes NPT through integrated fluid design, monitoring, and on-site support, ensuring smooth, uninterrupted operations. Integrated Fluid Management Fluidsteq combines lab-tested fluid formulations with field-ready adjustments, ensuring: Optimal density,…
Read article






